Initial Site Prep:

Excavation, grading, compaction, footing prep for fence posts, lights, basketball hoop, and net posts.

Advanced Site Prep:

5” of roadbase, compaction, concrete forms, vapor barrier, steel post tension cables running both ways every ~3 feet with additional rebar reinforcing around perimeter.

Concrete:

Pour concrete with a 1% slope for water runoff.

Post Tensioning:

Reinforcing the concrete with high-strength steel cables, which are tensioned two different times the week after the concrete has been poured.

Accessories:

Install fencing, light poles, basketball hoop, etc.

Surfacing:

SportsMaster surfacing for exceptional playability and durability.

Finished Court:

Enjoy countless hours of fun on your dream court!